Monday, 16 August 2010

Schemes

Unavailable!

Contact Us

Here, we allow you to contact Develop Plymouth in a variety of ways!
Develop Plymouth Is located Within Plymouth, PL3.
We do not provide the exact address as the website is managed by a single owner. Apologies.



You can However:
Email Us at: DevelopPlymouth@live.co.uk
Alternatively, You may leave us a comment below!

Your Say!

Welcome to the Your Say! section of the site! This is the place for you to come so that you can contribute your idea's as to how you would improve Plymouth, and help it to develop! We'll be working to help give your idea's a chance at being successful, so why not leave your comments below!


Building Profile: Oceanique

Oceanique QUICK DETAILS!

Videos(0): None
Location: Notte Street, Plymouth (Link: NA)

Oceanique STATUS -  
Progressing (Due Completetion Date: Sept  2012 Expected Completion Date: Sept 2012)

 A landmark tower sits at the focal point of the new public space with a design emphasis on urban activity and high quality architecture. The aim of the project is to create a destination for both the visitor and the people of Plymouth, a place for gathering and meeting. The site forms a pivotal link in the urban renaissance of Plymouth.

Development of the project required the development of a complex masterplan for not only the 1.2ha site but required extended Urban Design Appraisals and Detailed Feasibility Studies. The creation of a public space was central to the scheme and supported the creation of a high quality hotel as well as retail and commercial spaces including proposed bars and restaurants. Office accommodation in the order of 65,000sqft and 172 luxury apartments and Affordable Housing completed the fully integrated mixed use development.

Sustainability was a critical design element in the development of the project with an aspiration to exceed the 10% Statutory requirement for on site renewables, including extensive green roofing systems, biomass boilers and a site wide CHP system.

ADG acted primarily as Lead Designers for the Project Team that included Davis Langdon, Hyder Consulting and Hoare Lea and 10 other Specialist Consultants in the preparation of the complex planning submission that received unilateral support from the LPA. In developing the project for the later production stages it is considered that a limited 2 stage tendering process will be engaged and that an NEC3 Form of Contract will be the most appropriate.

A new proposal has been developed with the Client and Project Team resulting in a new application being made which is believed will progress the development of the project on site with a development that will rise above the recent economic difficulties. ADG acted as Architects, Planning Consultants and through ADG Integra, Facade Consultants.

Building Profile: Tesco New George Street Store Refit

Tesco Store Refit QUICK DETAILS!

Images(0): None
Videos(0): None
Location: New George Street, Plymouth (Link: NA)

Tesco Store Refit STATUS -  
Complete (Completetion Date: 23rd Aug 2010)

Tesco Store Design
Tesco will be aiming to improve the look and layout of the store both internally and externally!


Sunday, 15 August 2010

Studio 5-11 Building Profile

Studio 5-11 QUICK DETAILS!

Videos(0): None
Location: Millbay Road, Plymouth (Link: NA)

Studio 5-11 STATUS -  
Progressing (Due Completetion Date: Sept 2010 Expected Completion Date: Dec 2010)

Studio 5-11
Studio 5-11 is a newly refurbished high quality business centre in the heart of Plymouth and the Millbay Redevelopment area. The offices are within walking distance of the city centre with all it’s amenities and a short journey to Plymouth train station making it highly accessible to clients.

Centrally located the office occupies a very prominent position fronting Millbay Road, one of the City’s main arterial routes. Generous car parking is available to the rear of the building accessed from Millbay Road.

Plymouth provides an excellent working environment with facilities for staff and business close by with the main city centre shopping area, Sutton Harbour and The Barbican.

Transport communications are excellent from the City Centre with a regular rail service to London Paddington, fastest journey time approximately 3 hours. On the outskirts, the City airport has scheduled daily flights to London Gatwick and there is a major port facility at Millbay currently run by Brittany Ferries.

The Millbay area is a popular location with extensive investment into new developments including the Millbay Redevelopment and residential schemes at Cargo and Pheonix Quay.

Building Profile: Plymouth College of Art and Design

 PCAD QUICK DETAILS!

Videos(1 NA): Animation of Reception Area (Not available)

 PCAD STATUS - Progressing (Expected Completion Date: 12th September 2010)

PCAD NEW LOOK
The new look black and white exterior will improve the appearance of the building, in keeping with the College’s new branding.


Principal, Lynne Staley-Brookes said: “We’re extremely excited about the new design and hope everyone agrees that the outside will now reflect the excellent facilities and creative environment we have inside the building.”
As well as replacing the old PCAD sign with the new logo, the studio theatre will be encased in metal and lit from behind; illuminating the building and skyline dramatically at night.


The front will be extended to create a larger Information Point and gallery. The Gallery will now be considerably larger, and offer high quality and multi-purpose exhibition space. This will tie in a new name and re-launch of the gallery.
Information Point will be revamped too, with a dynamic visual impact and welcoming area for the public, visitors and students.
 An extensive green and landscaped frontage will replace the existing front car park, giving space for students, staff and the public to meet, sit, and display external sculptures for example.
Materials used in the build, along with replacement windows have been chosen to improve the building’s sustainability and environmental impact.
During the works period, alternative entrances will be used at the rear and side of the building and new signage will make access as easy as possible.